Almost every product efficiency rating or financial report completed with an inaccurate BOM will end up costing the company a lot of money when the mistake is found. If you don’t have an accurate BOM, the result is a manufacturing process that becomes inefficient due to inaccurate information. ![]() On the opposite end of the spectrum, you can have a bill of materials “explosion” that breaks up the assembly or sub-assembly into multiple component parts. There are also what’s called a bill of materials “implosion” that links pieces that serve as components to a major assembly. ![]() If you have a BOM that’s representative of a sub-assemblies, it is a modular BOM. ![]() To prove the point that you need the right ERP solution for your bill of materials, you have to start at the beginning in understanding what a bill of materials is and how having the right ERP solution provides a way for you to manage BOM effectively.īill of materials is a list of manufactured and raw materials needed to build an assembly of more than one manufactured part. BOMs are hierarchical with the top level representing the finished product, which can still be at a sub-assembly level or at a completed one.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |